Precise installation of showers, baths, toilets, basins, vanities, and accessories—aligned, sealed, and tested. Ideal for replacing a tired bathroom without guesswork, with a clean finish and reliable water pressure, drainage, and fit.
End-to-end refits including strip-out, plumbing and electrical coordination, waterproofing, tiling, and finishing. Perfect for homeowners who want a full transformation with one managed plan, clear timelines, and consistent workmanship throughout.
Targeted repairs and upgrades—replacing failing showers, taps, valves, toilets, and seals. Great for stopping drips, improving performance, and modernising the look without a full renovation, with minimal disruption and neat finishing.
Accurate measuring prevents costly surprises. Confirm wall lengths, waste locations, door swings, and clearances around the toilet and shower. We check levels, pipe positions, and ventilation routes before ordering so your suite fits cleanly with no awkward gaps or last-minute swaps.

For busy homes and rentals, prioritise easy-clean surfaces, solid hinges, quality valves, and accessible service points. We help you select taps, showers, and furniture that withstand daily use, reduce limescale build-up, and keep replacements simple if needed later.
Leaks usually start behind tiles. We use correct tanking systems in wet zones, seal penetrations, and finish with neat silicone lines where movement occurs. This reduces the risk of damp, cracked grout, and hidden water damage in ceilings and adjoining rooms.

A renovation is the chance to fix what never worked. We optimise the layout for movement, towel storage, and cleaning access—often improving comfort by relocating the shower, selecting space-saving furniture, or using wall-hung units to open up the floor.
Good bathrooms feel fresh and bright. We specify proper extractor fans, humidity control, and layered lighting (task + ambient). This helps prevent mould, protects paint and grout, and makes mirrors and shaving/makeup areas more usable year-round.
If you’re planning long-term, consider slip-resistant tiles, comfort-height toilets, wider shower entries, grab-rail reinforcement, and thermostatic controls. We can deliver a stylish finish while building in safety and comfort without a clinical look.
Typical stages include survey and quote, strip-out, first-fix plumbing/electrics, waterproofing, tiling, second-fix, and final snagging. Knowing the sequence helps you plan access, deliveries, and downtime—while ensuring nothing is rushed or installed out of order.
Costs usually depend on suite quality, tile choice and coverage, plumbing moves, electrical upgrades, waterproofing needs, and labour access (parking, stairs, disposal). A detailed quote should state what’s included, what’s excluded, and provisional allowances where relevant.
Most installs run faster with early product selection, confirmed delivery dates, and clear decisions on layout and finishes. We schedule trades in sequence and protect floors and common areas. Delays often come from out-of-stock items, hidden pipe issues, or late changes.
We had a full refit done and the team kept the place tidy every day. The tiling lines are perfect, the shower pressure is excellent, and the final snag list was handled immediately.
Clear quote, no surprises, and the timeline was exactly as promised. They helped us choose fixtures that suited the space and the finish looks like a boutique hotel.
Our old shower was leaking into the ceiling below. They found the cause quickly, re-sealed and replaced the valve, and explained how to prevent it happening again. Fast and professional.





